A vibrant, full-length mezzanine dressing room is elevated above the storage zone, defined by two contrasting yet complementary color atmospheres.
1
2
3
In the 2nd phase of the renovation of changing rooms at Ledina Grammar School, we used the advantage of the high ceiling and placed the wardrobe to the mid level, creating a new floor. In this way we freed the ground level for access to both of the gyms.
4
The idea to maximally exploit the volume for the changing rooms and storage underneath consequently shaped the volume, which fits perfectly in the space and guarantees the maximum usable area.
5
6
The storage and changing room are hidden behind the wooden panels, which are fixed on a steel structure like a "barcode" and painted in gentle blue. The ground floor ambient is therefore cool and calm, while the upper floor shines in bright orange.
The duality of the ambience is interesting and unusual because the visitor does not see the transition from one color to another except through a sequence of views when moving through the space.
7
8
9
10
11

12
13
14
Information
Project brief: Boys' dressing room renovation
Location: Ljubljana, Slovenia
Project date: 2013
Completion date: 2013
Area: 43 m²
Type: Educational
Client: Ledina Grammar School
Photographer: Matevž Paternoster
Project Team
SVET VMES – Jure Hrovat, Ana Kreč, Ana Kosi
15
16